Work Order #1 — Research, KB build-out, and maintenance schedule proposal

Researched Nov 9, 2026 by the Polaris Ranger XP 700 desk (The Ranch Hand). Status: research complete; schedule is a PROPOSAL for Dave to tune. Update, Nov 9, 2026: the machine is confirmed a 2009 (DMV card + VIN) — see docs/research-2009-addendum.md for the 2009 re-scope (manuals, model numbers, boot sourcing). Sections below that were written year-unknown stay as the record of the initial pass; the addendum governs where they differ. Nothing here overrides the factory manual for the machine's actual model year. Where sources disagree by year, the disagreement is flagged — that is the year-split problem in action, and it's why the VIN comes first.

1. Year identification — do this first

Year-split points that make the year matter

2. Factory documentation

3. Parts sources (fiche / lookup)

4. Spec facts — sourced, with the year caveat

For the XP 700 4x4, from the 2007 factory service manual summaries and the 2008 owner's manual P/N 9921268. Confirm each against the confirmed year's manual before a wrench turns.

5. Community — forums and YouTube

6. The split CV boot — job plan (Priority #1)

  1. Identify: corner (front/rear, left/right) + inner or outer boot, photograph it. Inspect the joint itself: grit in the grease, play, or clicking on lock means the joint is suspect — a boot over a ruined joint is false economy. Boot-only vs. joint/axle is Dave's call, with the inspection facts in front of him.
  2. Confirm the year from the VIN (§1) — the boot kit is year- and corner-specific (§1, §3).
  3. Source the kit (boot, CV grease, both clamps) — OEM from the fiche, or All Balls / EPI equivalent for that exact year + corner — for Dave's approval before ordering. Nothing is ordered yet.
  4. Tools on the bench: jack + stands, lug wrench + torque wrench (90 ft-lb lugs; hub/spindle torques in §4), snap-ring pliers, CV boot clamp tool, grease, shop towels, drain pan for the mess. Procedure reference: service manual, Final Drive chapter.
  5. Time: plan one unhurried shop session (estimate only — Dave knows his pace; the desk doesn't invent a number).
  6. While that corner is apart: inspect the other three boots, brake pads (1 mm limit), and wheel bearing play — same chart, same visit.
  7. Log it: date, hours, corner, part number, who did it — service log in KNOWLEDGE.md.

Sources


Work Order #1 — 2009 addendum (Nov 9, 2026)

Trigger: Dave photographed the CA DMV OHV validated registration card and sent it to Astro, Nov 9, 2026, 09:03 PT. Source photo: ~/workspace/user/files/10879571-E8B2-4450-B804-C03AD7AEC5AF-photo-D67011C7-83F6-4653-BF0A-2C4BCF3D1AD4.jpg (read directly by this desk — every field below was read off the card).

Identity — resolved

2009 factory documentation (re-scoped)

2009 CV boot sourcing (corner + inner/outer still required)

What changed in the desk's records