The living collaboration record: her priorities, the review rhythm, decisions made together, and everything owed to her. Pull this desk before a 1:1 or a status update.
Roughly 1–2 weeks of design work. Jira is the source of truth (not Dave's notes) — Connie created the epic from Shreya's ask, tagging the data capture team. Proper components and 'child of' epic associations.
Dave isn't Jira-fluent — Sparsh bridges the gap.
Cadence unconfirmed
From the 4:30pm review with Connie the same day: Dave finishes remaining ACV prototype items by noon Friday Oct 16 and shares with Liz; bulk action buttons need more workshopping; two-button bulk update waits for Liz until Connie returns.
Shreya leads the STIX team: Dave, Connie Ko, Sparsh. Her own manager is Stephen. Parent buddy: 💻 Work Buddy.
Dump what's on your mind about Shreya Dhingra — raw and unfiltered. Each dump lands in the buddy's repo (docs/ingest.md) as a timestamped entry — or saves on this device until a GitHub token is connected.
🔒 Connect GitHub to unlock dumping. Paste a token once — it stays on this device only.