Morgan Hill, California β co-sold by three brothers. Every spend needs all three to agree.
π Dave β co-sellerπ¨β𦳠Ron β co-seller (oldest)π§ Emile β co-seller (middle)π Kay Korbel β listing agent, the hub
At a glance
$21,643.67
total PAID to date β all payers (the brothers + Kay), as of Nov 19, 2026. Full breakdown in The Money, below.
$36,143.63
due & committed, not yet paid β paint balance $24,570 Β· Venosta $5,705 Β· Nelson's $3,881 Β· signed crawl-space work $1,020 Β· Sergio extra hauling $800 Β· water $167.63
$4,250
awaiting decision β staging (Mayra Vera). Also open: crawl-space liner reseal quoted at $3,600; two quartz countertop bids still coming
β Handled Nov 20
HomeGuard $23,989 (Report 682572) β Dave confirmed it's handled. No payer or method was specified, so it's recorded as handled on his word, not counted in Paid
The money β as of Nov 20, 2026
Compiled Nov 19, 2026 from Kay's updated third-party expense spreadsheet (Nov 14), the vendor invoices, and the completion/payment notices in the sale record; updated Nov 20 for the HomeGuard clearance. Paid means the money is out β whoever fronted it. This snapshot is kept current as new payments land.
Paid β $21,643.67
Rodent proofing, Silicon Valley Rodent Proofers β $6,260.00 β main job $5,800 (invoice #1761, paid by check), attic cleanup $375 (invoice #1774, Kay paid by check), inspection fee $85
Clean Crawl Space β $2,925.00 β sump-pump servicing $1,125 (#14637) + vapor-barrier pull-down $1,800 (#14644), both paid by Ron
Painting deposit, Platinum Painting β $2,730.00 β 10% deposit on the $27,300 exterior + interior job, paid by check
HomeGuard inspections bundle β $1,345.00 β pest / home / roof / sewer / spa inspections (Sep 28)
Sergio Gardening, hauling β $2,450.00 β two hauls + extra work (SepβOct, by Zelle)
MG Constructors, structural engineer β $1,350.00 β Kay paid by check (inside her out-of-pocket below)
CA Resort Home (Jason Adair) β $1,174.00 β paid in full by card (50% deposit Oct 27)
Fireplace inspections, Dave Montgomery Masonry β $695.00 β Kay paid by check
City of Morgan Hill water/sewer β $652.13 β Bill #421657, paid Nov 10
Duke's Heating & Air β $575.00 β inspection + repair, Kay paid
Nelson's Pool Service, spa repair β $583.00 β invoice #4645
Wine fridge (Amazon, via Kay) β $415.63 β bought Nov 14; the sellers' keep-or-return vote is still open, and it comes back out of this total if it's returned
Kay's small out-of-pocket items β $488.91 β Costco smoke/CO alarms $198.20 Β· Home Depot recessed lights $160.98 Β· office/laundry light fixtures $44.28 Β· toilet seats & light bulbs $85.45 Β· (plus her SVRP inspection fee $85, counted in rodent proofing above; her $3,064.18 through Oct 6 also covers the MG, masonry and Duke's lines above β nothing here is counted twice)
Handled β Nov 20
HomeGuard, Section One termite repairs β $23,989 β work complete Nov 12, clearance issued, statement in (Report 682572). Handled per Dave, Nov 20 β he confirmed it's handled; no payer or method was specified, so it is recorded as handled on his word and is not counted in Paid above. (The $225 DPA-fee waiver question went moot with the handling.)
Due & committed β not yet paid: $36,143.63
Platinum Painting balance β $24,570 β the rest of the $27,300 job after the paid deposit; painters are on site
Venosta plumbing β $5,705 β Dave chose Venosta on Nov 17 and told Kay by text; Kay is scheduling. Not yet done or paid
Nelson's Pool, invoice #4986 β $3,881 β spa heater $3,741 + $140 monthly service; Kay's condition: the heater is paid after its post-cover test
Clean Crawl Space, signed sub-area work β $1,020 β 18 liner holes + alarm wire; scheduling for early December now that the house is rodent-clear
Sergio Gardening, extra hauling (Oct 19β20) β $800 β work done, payment in process per Kay's sheet
City of Morgan Hill water β $167.63 β new bill (statement Nov 15), due Dec 10
Ongoing monthly services β Sergio gardening $340/mo and Nelson's pool service $140/mo run while the house is prepped; not folded into the totals above
Awaiting decision β not spent
Staging, Mayra Vera β $4,250 β plus extras (painting, wallpaper, cleaning, hauling) never priced all-in
Crawl-space liner reseal β $3,600 quoted β or a full replacement (unquoted, "much more"); the brothers' call
Quartz kitchen countertops & backsplash β two bids coming (Kay, Nov 14); no figures yet
Planned, sequenced later β house cleaning $3,000 (after painting) Β· photography $950 (after cleaning) Β· garage concrete repair $340
Two honest gaps: the November fumigation's cost is bundled inside HomeGuard's Section One line on Kay's sheet (plan figure $23,705) β the statement's $23,989 is the number carried here. And a correction to this page's old snapshot: of the $10,050 once shown as "awaiting sign-off," the $5,800 rodent job was in fact paid on Oct 18 β only the $4,250 staging remains open from that pair. The full running record also lives in The Llagas Creek Gazette β The Money.
Awaiting decisions
ποΈ Staging β $4,250 + extras
Mayra Vera's design/styling fee using the sellers' furniture. Painting, wallpaper removal, cleaning, repairs, and hauling are extra β never priced as one all-in number. Decide whether staging happens, and what Kay goes back with.
π· Wine fridge β keep or return? ($415.63)
Kay bought it on Amazon (Nov 14) and can return it if the sellers don't want the expense. The keep/return vote is still open β Dave's vote hasn't been sent yet.
π¦ The sheds
Kay sent the contents list and shelf measurements (Oct 20β21). What stays, what gets hauled, what gets sold.
Latest from Kay
Nov 19 β Kay forwards HomeGuard's urgent note: an active roof leak into the primary bedroom closet. She also forwarded the HomeGuard statement of account ($23,989, Report 682572) this morning.
Nov 17 β Dave decides the plumbing: Venosta ($5,705), told to Kay by text. Kay to schedule.
Nov 16 β Venosta's itemized bid lands ($5,705, plus a free car-lift removal offer). Painters are on site doing interior prep.
Nov 14 β Kay's updated expense spreadsheet: the $415.63 wine fridge (keep/return vote), the outstanding light fixtures, two quartz countertop bids coming. She also agreed the plumbing work must be done β PG&E gas service is off until the gas line is replaced.
Nov 13 β Superior Plumbing's Estimate 3131 lands at $12,500; Ron approves it that night. Kay confirms the rodent infestation has been cleared and the fumigation tent is off.
Nov 12 β HomeGuard's Section One termite repairs are complete: Notice of Completion, Section One clearance and invoice sent (Report 682572). Sonny's vapor-barrier reinstall directive goes to Clean Crawl Space.
Nov 10 β The city water bill ($652.13) is paid; completion notice that evening.
Oct 21 β Shed contents list and shelf measurements arrived. Fumigation tenting (Oct 19β21) wraps today.
Oct 19 β Kay requested the paid receipt from Clean Crawl Space and followed up on the additional sub-area repairs; she also followed up with Ron on both crawl-space invoices.
Oct 16 β Crawl-space appointment day: Kay forwarded invoices #14637 and #14644 to all three sellers, with job photos.
Oct 8 β Kay circulated a revised exterior paint bid to all three sellers.
Oct 7 β Julio Arciga sent rodent-proofing Estimate #787 ($5,800).
Oct 6 β Kay circulated the fireplace and HVAC inspection reports/invoice; HomeGuard confirmed the repair and fumigation schedule.
The one complete record of everything Kay has sent β emails logged by thread, texts added as Dave passes them along. Sale archive, email index, and job req live in this buddy's repo; KNOWLEDGE.md holds the full state of the sale.
ποΈ The Desk
Everything Llagas Creek Sale knows and how it's configured to behave. Connect your GitHub token once to read and edit β it stays on this device only.